Jun 27, 2010
Jun 26, 2010
Kali gandaki Hydro power Mirmee
The main structures of the project are a concrete gravity diversion dam of about 100 metres (330 ft) in length and 43 metres (141 ft) in height, an open surface desander, a headrace tunnel of about 6 kilometres (3.7 mi) in length and 7.4 metres (24 ft) in diameter, and a surface powerhouse. The rated discharge of 141 m3/s feeds the three turbines in the powerhouse. The reservoir has a surface area of 65 hectares (650,000 m2), and is followed by a 5.3 kilometres (3.3 mi)-long back water level. Permanent camps are located at Beltari and Mirmi, in Shree Krishna Gandaki VDC, Syangja.The power generated by the three turbines is evacuated to the central grid via a 132 kV single circuit, a 66 kilometres (41 mi) long transmission line to Pokhara, and a 44 kilometres (27 mi) double circuit transmission line to Butwal.A sub-station has been constructed in Lekhnath, Kaski and the existing Jogikuti substation in Butwal has been upgraded.
Jun 20, 2010
Jun 16, 2010
Jun 11, 2010
Jun 7, 2010
Jun 6, 2010
Three injured in Group-Fight in Mirmee
Mirmee(june6):
Three police are injured in a group fight in Guthi; Syangja. two groups of youths have been fighting while a team of police arrived in Guthi. Three police have been injured when they tried to control the discussion between two groups.
Local youths of Guthi broke two sets of gun of two police. It is also reported that both the groups were fighting with each other after drinking alcohol.
with the help of Keshab Neupane
Three police are injured in a group fight in Guthi; Syangja. two groups of youths have been fighting while a team of police arrived in Guthi. Three police have been injured when they tried to control the discussion between two groups.
Local youths of Guthi broke two sets of gun of two police. It is also reported that both the groups were fighting with each other after drinking alcohol.
with the help of Keshab Neupane
Subscribe to:
Posts (Atom)